News

The brief articles below recognize the steps forward taken by our imaginative, resourceful and hard working managers and staff in the last couple of years:

Oct
25

INFRAPIPE Releases New Maintenance & Repair Manual

INFRAPIPE has just released its new Manual for all aspects of Inspection, Repair, Maintenance and Modification and with it a list of Recognised Support Professionals – those with the skills and equipment to undertake repair or modification work, should an asset manager not wish to go through INFRAPIPE, Solo or Promains and it is available on the website here.

Oct
25

INFRAPIPE Launches CIVILPIPE & FARMPIPE Lines in NZ

Now that testing and certification is complete, INFRAPIPE has launched the CIVILPIPE in SN8 (blue stripe) and SN16 (red stripe) for infrastructure applications FARMPIPE in SN6 for forestry and rural use. Whilst there are some inferior imported equivalents, there is no other manufacturer of twin wall above DN450 in New Zealand and INFRAPIPE believes this offer of a trusted product at a great price will be welcomed in the market.

Oct
25

INFRAPIPE Earns Rail Approval for Heavy-Duty Pipes

INFRAPIPE has been awarded Type Approval for their pipes in heavy duty configurations in railside applications up to 2m in diameter and 15m deep (more by special design). It is the only pipe solution thus recognised and is being used for the rehabilitation of the Northern Line and work on the Main Line in the Drury & Pukekohe areas.

Sep

Technicool Upgrades Climate Control at Mercury Arena

Technicool is the maintenance partner for council venues in the Bay of Plenty so when the 17,000 seat Mercury Arena needing an upgrade to its climate control, Technicool were there to help.

Sep
25

National Traps Launches BT150 for Weasels, Stoats & Rats

National Traps has now released into the market the BT150, kid brother to the highly successful BT200 and BT250 and aimed at weasels, stoats and rats

Sep
25

INFRAPIPE Supplies 3.2m Culvert for Whakahuu Recovery

The Whakahuu replacement culvert is a mighty 3.2m diameter culvert from INFRAPIPE – the largest pipes being made in Australasia. Part of the restoration work after Cyclone Gabrielle, the wingwalls were cast in situ and fish passage enhancements included baffles inside the pipe and a ladder outside it.

Sep
25

Smartwave Boats Earn US Coast Guard Certification

Galloway has successfully completed USCG (US Coastguard) certification for the Smartwave range of boats. Whilst the MAC range has always had EU & US certification, Smartwave initially only applied for EU Certification but now there is growing interest in the Smartwave range from the US and other countries, it was essential to pay a testing firm to sink the boats to the bottom of a swimming pool with weights for a couple of days to test the resilience of their buoyancy.

Aug
25

INFRAPIPE & Galloway Move to Combined East Tamaki Facility

Infrapipe and Galloway have completed their move into a new combined facility at Kerwyn Avenue in East Tamaki. For INFRAPIPE it houses the pressure pipe extrusion lines – which need a building 70m long, while Galloway’s MAC & Smartwave boat fit-out and Viking kayak division occupy the remainder of the 3500 sqm building. Located only 1k from the respective factories, it makes the best use of space and permits both companies to run better shift patterns by having staff co-located.

Jul
25

Technicool CO2 Waste Heat System Prevents Frost Heave

Technicool provides the most efficient solutions possible and in combination with a huge CO2 refrigeration plant for the cold store extension, has provided a matching glycol heating system. Without control the temperature difference between the slab and the soil and the layers of the slab can cause icing and expansion, and the consequent frost heave literally raises the floor – an expensive problem. Technicool’s ingenious solution recovers waste heat from the main CO2 plant and sends it through pipes in the slab, keeping the freezing at bay.

Jul
25

Manawatu Cold Store Encloses Room 8 Expansion

The last of the panels is about to go in at the cold store, marking the end of the period when the Manawatu’s delightful climate could endanger the timeline. With six truck docks and 3000m2 of refrigerated floor space, Room 8 represents a considerable increase in the capacity of the region to support its meat exporters.